OV-C2-AG-15-SHELL · v0.1 · 2026-08-17Download PDF
DoctypeAssembly Guide
Doc idOV-C2-AG-15-SHELL
Product lineopenvvvf
Applies tochassis-size-2
Version0.1
Date2026-08-17
DescriptionMount the outer shell/enclosure onto the assembled Chassis Size 2 power stage.
Nav order238
PlaceholderTrue
Normative refsOV-C2-AG-INDEX
Placeholder / Under Revision - This page is incomplete or out of date and will be revised.

Outer Shell Mounting

This chapter will cover mounting the outer shell onto the assembled power stage. It is currently being written. The build is in progress and photographs are being taken.

Safety
- Do not power the inverter until all assembly, torque, and inspection steps are complete.
- Review the hazard analysis (OV-SAF-HARA-CORE) before starting.