OV-C2-AG-09-CA-MNT · v0.1 · 2026-08-17Download PDF
DoctypeAssembly Guide
Doc idOV-C2-AG-09-CA-MNT
Product lineopenvvvf
Applies tochassis-size-2
Version0.1
Date2026-08-17
DescriptionMount the assembled control module into the Chassis Size 2 power stage.
Nav order232
PlaceholderTrue
Normative refsOV-C2-AG-INDEX
Placeholder / Under Revision - This page is incomplete or out of date and will be revised.

Control Assembly Mounting

This chapter will cover mounting the assembled and tested control module (see the Control Assembly guide, OV-CA-AG-INDEX) into the C2 chassis and making its mechanical and electrical connections. It is currently being written. The build is in progress and photographs are being taken.

Safety
- Do not power the inverter until all assembly, torque, and inspection steps are complete.
- Review the hazard analysis (OV-SAF-HARA-CORE) before starting.