Final Control Assembly

This chapter will cover completing the control-side wiring (gate-drive, current-sense, and temperature-sense connections) and closing out the final control assembly. It is currently being written. The build is in progress and photographs are being taken.

Safety
- Do not power the inverter until all assembly, torque, and inspection steps are complete.
- Review the hazard analysis (OV-SAF-HARA-CORE) before starting.