OV-C2-AG-13-REVIEW · v0.1 · 2026-08-17Download PDF
| Doctype | Assembly Guide |
|---|---|
| Doc id | OV-C2-AG-13-REVIEW |
| Product line | openvvvf |
| Applies to | chassis-size-2 |
| Version | 0.1 |
| Date | 2026-08-17 |
| Description | Pre-power review checks: torque witness marks, polarity, insulation, and workmanship inspection. |
| Nav order | 236 |
| Placeholder | True |
| Normative refs | OV-C2-AG-INDEX |
Review Checks
This chapter will cover the pre-power review checks: verifying torque witness marks, connector seating and polarity, insulation and clearances, and a full workmanship inspection against this guide. It is currently being written. The build is in progress and photographs are being taken.
Safety
- Do not power the inverter until all assembly, torque, and inspection steps are complete.
- Review the hazard analysis (OV-SAF-HARA-CORE) before starting.
