OV-C2-AG-13-REVIEW · v0.1 · 2026-08-17Download PDF
DoctypeAssembly Guide
Doc idOV-C2-AG-13-REVIEW
Product lineopenvvvf
Applies tochassis-size-2
Version0.1
Date2026-08-17
DescriptionPre-power review checks: torque witness marks, polarity, insulation, and workmanship inspection.
Nav order236
PlaceholderTrue
Normative refsOV-C2-AG-INDEX
Placeholder / Under Revision - This page is incomplete or out of date and will be revised.

Review Checks

This chapter will cover the pre-power review checks: verifying torque witness marks, connector seating and polarity, insulation and clearances, and a full workmanship inspection against this guide. It is currently being written. The build is in progress and photographs are being taken.

Safety
- Do not power the inverter until all assembly, torque, and inspection steps are complete.
- Review the hazard analysis (OV-SAF-HARA-CORE) before starting.