OV-C2-AG-14-LVT · v0.1 · 2026-08-17Download PDF
DoctypeAssembly Guide
Doc idOV-C2-AG-14-LVT
Product lineopenvvvf
Applies tochassis-size-2
Version0.1
Date2026-08-17
DescriptionFirst low-voltage power-up, sensor checks, and calibration of the Chassis Size 2 power stage.
Nav order237
PlaceholderTrue
Normative refsOV-C2-AG-INDEX
Placeholder / Under Revision - This page is incomplete or out of date and will be revised.

Initial Low-Voltage Testing and Calibration

This chapter will cover the initial low-voltage power-up, sensor sanity checks, and calibration. High-voltage testing is covered separately. It is currently being written. The build is in progress and photographs are being taken.

Safety
- Do not power the inverter until all assembly, torque, and inspection steps are complete.
- Review the hazard analysis (OV-SAF-HARA-CORE) before starting.